18/03/2026
Sometimes you just get to go to those jobs you wont forget ever.
The cpc to these acessories has been removed completley. Less than ideal.
Upon pulling the socket forward the line conductor wasnt terminated in place.
These are just a couple of things we found on a recent EICR of a shop.
As well as melted connector block in a light switch the cable was phsically warm to touch also.
At the time of test all the lighting for the entire building was found tagged into a 32 amp mcb suspected due to overloading (clamped at 9 amps)
Remedial work is ongoing at current. Including removal of old unused circuits and cable.
Then full labeling and schedules can take place to make it much easier for the next time any maintinance or electrical work is undertaken. It isnt easy working around a shop thats open 7 till midnight 7 days a week.
However we are managing to keep the buissness open while carrying out vital remedials and upgrades.