11/07/2026
A proud milestone for the CompleteTech team! We recently onboarded a new client and completed a full server room modernization project, transforming a cluster of desktop PCs and a maze of unlabelled cables into a high-performance, enterprise-grade environment.
๐ฅ๏ธ Infrastructure Upgrade
โข Server: Dell R450 12C 24T CPU, 64GB ECC RAM, 3TB Enterprise SSD storage
โข Networking: Dual 10GbE NICs for redundancy and high throughput
โข Switching: UniFi 48 Port Pro Max POE with 2.5Gb LAN ports and 10Gb fibre uplinks
โข Gateway: UniFi Fibre Gateway supporting up to 10Gb WAN/LAN, connected to 1Gbps Internet and 10Gb fibre backbone
๐ก Wireless & Connectivity
โข 2ร UniFi U7 Pro Access Points with 2.5Gbps LAN cabling for high-density coverage
โข 2.5Gb LAN cards and cabling for main admin users to ensure ultra-fast server access
๐ Power & Reliability
โข 3KVA Online UPS for clean, uninterrupted power delivery
โข All systems surge-protected and tested under load
๐ Backup & Data Protection
โข Encrypted hourly onsite backups for immediate recovery
โข Secure twice-daily offsite replications to ensure business continuity and disaster resilience
๐งฉ Cable Management & Optimization
โข Every cable traced, tested, and labeled for future scalability
โข Rack layout optimized for airflow and maintenance access
โข Fibre and copper runs neatly organized with structured patch panels
โข User desk cabling neatened and managed for a professional, clutter-free workspace
From a cluttered, inefficient setup to a fully optimized, high-speed network backbone with robust backup strategy โ this project reflects CompleteTechโs commitment to precision engineering, reliability, and long-term scalability.