A 10% jump in materials doesn't mean your quote goes up 10%.
In this example from our guide, a $10,000 job had $4,000 in materials. Materials rose 10%, so that line went up $400. Labor and everything else stayed put. The whole job moved 4%, to $10,400.
If a contractor sends a revised quote after the expiry date, ask which lines changed and by how much. Compare line by line, not by the total.
The guide also covers the 3 dates behind an expiry line and a 9-point bid checklist: