09/28/2026
A lookahead written on the back of a piece of drywall.
That's how one contractor described their field planning before Outbuild. Sometimes Excel, sometimes drywall, never connected to the CPM.
So supers built schedules their own way, without the logic behind them. The office had one plan. The field had another.
The fix wasn't a better spreadsheet. It was continuity, one schedule the office and the field are both working from.