06/03/2026
Most of the time that goes into bidding a job isn't estimating — it's counting. Heads, pipe runs, fittings, valves, zones. You draw the plan, and then you count what's in it.
In PCS, that count comes out of the drawing. Generate a material takeoff directly from your plan — heads, pipe, valves, the works. Less time before you submit a number. Fewer counting errors on the bid. More time on the jobs you've already won.
Download the free trial at softwarerepublic.com.