Spot On Performance, Inc.

Spot On Performance, Inc. SOP’s dashboards, tools, and reports enable workers to optimize their work in a smart, easy, and f

The season ends in November. The paperwork doesn't. 🗂️ ▶Swipe to see what close-out actually looks like at most operatio...
10/07/2026

The season ends in November. The paperwork doesn't. 🗂️

▶Swipe to see what close-out actually looks like at most operations — and what those twelve weeks are really costing you.

🎫SOP works captures every ticket, load, and cost the day it happens, against the job it belongs to. The season closes in days, and next season gets bid off real numbers instead of a February guess.

ALL Materials. ALL the Time. ALL in One Place.

Link in bio to book a demo.

Your stockpile number is a guess. 📊Swipe to see how that number actually gets made at most operations — and what it cost...
10/02/2026

Your stockpile number is a guess. 📊

Swipe to see how that number actually gets made at most operations — and what it costs you on both ends of the yard.

SOPworks keeps one live inventory number. Every ton produced and every ton sold moves it in real time, by product, by plant, by location — so variance shows up when it starts, not at year-end.

ALL Materials. ALL the Time. ALL in One Place.

How is Plant 3 doing right now? 📊▶Swipe to see where your numbers actually come from when you run more than one location...
09/16/2026

How is Plant 3 doing right now? 📊

▶Swipe to see where your numbers actually come from when you run more than one location — and what the blind spot costs you between now and the month-end close.

🔄SOP Works puts every plant, quarry, and yard on one live screen. Production, shipments, and jobs in the same format, as they happen — so you can move work, trucks, and material while the day is still in front of you.

ALL Materials. ALL the Time. ALL in One Place.
Link in bio to book a demo.

📱How many phone calls does it take to move one job on your schedule? 📋Swipe to see where the schedule actually lives in ...
09/11/2026

📱How many phone calls does it take to move one job on your schedule? 📋
Swipe to see where the schedule actually lives in most operations — and what it costs the morning somebody doesn't get the message.
🗓SOPworks puts the whole week on one live schedule. Change the job once and the plant, dispatch, and every hauler on it see it the same minute — with confirmations back so you know who saw it.
⛰ALL Materials. ALL the Time. ALL in One Place.
Link in bio to book a demo.

How many load tickets are riding around in your trucks right now? 🚛Every one of them is work you already did and haven't...
09/02/2026

How many load tickets are riding around in your trucks right now? 🚛

Every one of them is work you already did and haven't billed for yet. Swipe to see where the week actually goes — and what that gap costs you on every single load.

SOPworks captures the ticket at the load, posts it to the right job, figures the hauler's pay, and makes it billable the same day.

ALL Materials. ALL the Time. ALL in One Place.

Link in bio to book a demo.

Your sand plant runs on timing. Does your team know their schedule?That's the question every plant manager, dispatcher, ...
08/05/2026

Your sand plant runs on timing. Does your team know their schedule?

That's the question every plant manager, dispatcher, and operations coordinator at a frac sand mine, aggregate quarry, or bulk material operation has to answer every single day — usually by making a round of calls and sending a string of texts before the first truck rolls.

We just made that whole process disappear.

SOP Works now sends automatic scheduling notifications to carriers and crew personnel the moment they're assigned to a job. No call needed. No follow-up text. The second the schedule is set, every carrier and crew member gets an email directly to their inbox — job number, company, date of work, truck count, and a direct link to view their full schedule.

One platform to keep control of your jobs, crews, carriers, and trucks. Know your performance, your assignments, and keep your entire team in sync — automatically, from the moment you schedule.

If your operation runs on tight delivery windows and you're still chasing people down to confirm their schedule, this is the feature you've been waiting for. Visit sopworks.com to schedule a demo — no commitment, just a look at what the easiest scheduling you've ever done actually looks like.

⏳

✓ Truck Scheduling. ✓ Job Scheduling. Made Easy.Ask any dispatcher at a bulk material operation how their morning starts...
07/21/2026

✓ Truck Scheduling. ✓ Job Scheduling. Made Easy.

Ask any dispatcher at a bulk material operation how their morning starts and you'll hear some version of the same story. The phone rings before 6 AM. Someone needs to confirm a load time. A driver can't find the job site. A contractor wants to know where their material is. And somewhere in the middle of all that, the actual work of running the day has to happen.

Most operations are still managing that chaos with spreadsheets, text messages, and institutional knowledge held by one or two key people. That system works — until it doesn't.

SOP Works centralizes everything into one platform your entire team can see in real time. Every truck assignment and load window visible before the first truck rolls. GPS tracking on every truck so you know where things stand before the contractor calls. Plant and field check-in through the mobile app — no paper logs, no guessing. Live ton reporting on every active job. Ticket data flowing automatically so your team isn't chasing paperwork at the end of the day.

Truck scheduling made easy. Job scheduling made easy. Run your whole operation easily.

Built for asphalt, aggregate, and all bulk material production. Visit sopworks.com to schedule a demo — no commitment, just a look at what purpose-built looks like for the way you actually work.

The July 4 deadline came and went. Congress didn't act.The BUILD America 250 Act hasn't reached the House floor. The Sen...
07/09/2026

The July 4 deadline came and went. Congress didn't act.

The BUILD America 250 Act hasn't reached the House floor. The Senate's three key committees — Environment and Public Works, Commerce, and Banking — have not released their own bill text. September 30, when the IIJA expires, is now less than 90 days away.

Here's what every bulk material producer needs to understand: this is a pattern, not a crisis. Every major surface transportation law since 2005 has expired before Congress passed its replacement. SAFETEA, MAP-21, the FAST Act — all expired first. Each time, Congress passed a short-term extension and kept programs running while negotiations continued. The IIJA will be no different.

But extensions aren't neutral. Under a continuing resolution, new project lettings slow, state DOTs defer discretionary spending, and the pipeline of new work for 2027 thins while Congress works through conference negotiations. That's the environment your contractor customers will be operating in — and they'll be evaluating every supplier relationship more carefully, not less.

Your 2026 construction season is still running. Existing obligations are funded. The work is here now. The operations that use the next 90 days to demonstrate their reliability — through tighter dispatch, better scheduling, and real-time job visibility — will hold their contractor business regardless of what Congress does September 30.

Swipe through to see the full breakdown, and visit sopworks.com to see how SOP Works helps bulk material operations stay ahead of what's coming.

⏳Frac Sand and Quarries run around the clock. That's why many come to SOP, because we run around the clock.🚀 No down tim...
06/11/2026

⏳Frac Sand and Quarries run around the clock. That's why many come to SOP, because we run around the clock.
🚀 No down time, Always connected, and consistent value being given to all parties. 💲Stop the Bleed on receivables and inefficiencies with Spot On Performance.

SIMPLE and EASY to use for all parties involved!

Contact us Today and save yourself headaches and excess phone calls!
📧[email protected]

SOP Just released our biggest NEW FEATURE  drop of the Year! Check it out. NO matter the bulk material you produce, buy,...
06/05/2026

SOP Just released our biggest NEW FEATURE drop of the Year! Check it out. NO matter the bulk material you produce, buy, manage or truck for SOP can cover it all.
✅Producer
✅Contractor
✅Dispatcher/3PL
✅Operator

We tie together all functions into one easy to use app. View jobs in calendar, know who's trucking for you, know where the drivers are, digital reports and time cards, cut the accounting process into a fraction. You name it, we have it! Check us out our prices can't be beat either!

📧[email protected]

Address

5237 Summerlin Commons Boulevard, Suite 114
Fort Myers, FL
33907

Opening Hours

Monday 7am - 9pm
Tuesday 7am - 9pm
Wednesday 7am - 9pm
Thursday 7am - 9pm
Friday 7am - 9pm
Saturday 9am - 5pm
Sunday 9am - 5pm

Telephone

+12393072977

Alerts

Be the first to know and let us send you an email when Spot On Performance, Inc. posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Spot On Performance, Inc.:

Shortcuts

Share