There's a moment in every commercial project where the technology conversation shifts from "we should plan for this" to "we need to fix this."
It usually happens around 90% construction documents. Sometimes at submittal. Occasionally during commissioning.
By then, the options are expensive.
The TR that's two sizes too small. The conduit pathway that runs through a structural beam. The wireless coverage plan that doesn't account for the Owner's DAS requirements. The access control system that the IT department has never seen and won't approve.
None of these are surprises in retrospect. Every one of them had a moment (early in design) where a single conversation would have changed the outcome. We have that conversation at SD. Every time. If you have a project starting schematic design in the next 60 days, it's worth a call.