3 days. That is the distance between the first photo and the second.
Day 1 is a construction site. Concrete dust, a 24-port panel with its cables still loose, a UPS running off an orange extension cord because [reason the tech gives]. We post it because that is what a real install looks like at 9 AM on the first morning.
Day 3 is IDF-03. Four 48-port PoE switches, four patch panels labeled A through D, blue for data and purple for the access points, managed power that can reboot a single outlet from our office, and a UPS that gives the closet time to shut down cleanly if the building loses power.
Same building. Same two technicians.
The part the owner cares about happened between those photos and does not show up in either one: every drop was tested and documented before a single switch went live. The test report is what turns a nice photo into a network someone else can support at 2 AM.
Which photo does your server room look like right now?
P.S. Ask your last installer for the test report. If there is not one, that is worth knowing before something breaks.