08/29/2026
⚡Kopperfield now automatically runs both permitted methods for every duplex and shows you when a lower load is available under NEC 220.85.
Instead of running a second calculation by hand, you can:
✅ Compare both permitted methods automatically
✅ See the lower load in VA and amps
✅ Choose which value to use
✅ Get the applicable NEC code section cited on your final calculation
A few amps can be the difference between an existing service working or needing an upgrade. Now you can see the permitted options without doing the math twice.
🔗 Read the full update on the Kopperfield blog.