18/09/2026
INDIGO West (Perth–Singapore) is still only partially up. Aus Internet’s latest public note still points at an ETR of 16 Sep, with contingency through 20 Sep, and Singapore-end shunt work still lined up for 2 Oct. Central’s mid-Sep window sits in the same stretch.
Hot Failover only helps if the backup path is really there. Before a guest-heavy day or a critical upload, check InControl’s per-WAN graphs — don’t assume the Pacific underlay is fine just because Starlink looks green.
We're a certified supplier & installer and can support you or your preferred installer in deployment onboard & ashore. Starlink airtime also available with flexible plans and pool options.
https://gmts.io