Premier Wires Pvt. Ltd.

Premier Wires Pvt. Ltd. Gabionet Environment Solution Pvt LTD a sister concern of CG.. manufacture r of gabion boxes Premier Wires Pvt. Ltd.

an ISO 9001:2008 company, is one of the modern wires, cables and conductors industry in Nepal manufacturing largest and most versatile range of wires, cables and conductors, with glorious track record of over a decades.

Machine Made Gabion Box manufactured with Heavy Zinc Coating Galvanized Iron Wire ( Mesh wire size=3mm, Border wire size...
27/03/2016

Machine Made Gabion Box manufactured with Heavy Zinc Coating Galvanized Iron Wire ( Mesh wire size=3mm, Border wire size=3.9 mm N Lacing Wire=2.4 mm)

Gabion Wire at Soil Conservation Office Kathmandu, Babarmahal supplied by Premier Wires Pvt. Ltd..............
10/07/2015

Gabion Wire at Soil Conservation Office Kathmandu, Babarmahal supplied by Premier Wires Pvt. Ltd..............

24/07/2013

KATHMANDU, July 23 Three and half kilometer (km) section out of the 16-km main tunnel of the Upper Tamakoshi Hydropower Limited (UTKHPL) has become useless as weak rocks were found...

thanks a lot...
24/07/2013

thanks a lot...

A biref details about the Sunkoshi Hydropower Plant for the purpose of study of Bachelors of Engineering in Electrical. The video is shooted during the perio...

good news
23/07/2013

good news

KATHMANDU, July 18: The works of the Tamor-Mewa Hydel Project with a capacity of 101 MW to be constructed by the Spark Hydro Power is to be started in the...

Bad to know--work halted.
23/07/2013

Bad to know--work halted.

RASUWA, JUL 19 - Construction work on the 60-MW Upper Trishuli 3-A hydropower project has been halted for last two weeks. Putting forth various demands, local political leaders and stakeholders...

23/07/2013
14/07/2013

Seminar on Mini Hydro (100kW – 10MW) Development in Nepal: Status, Challenges and Prospects on 3rd July,2013. Introduction It’s agreed that hydropower is backbone of our energy infrastructures. Generating electricity...

Be aware Enginner..
14/07/2013

Be aware Enginner..

DOLKHA, July 7: Four days after local complaint of use of sub-standard construction materials in the 456 MW Upper Tamakoshi Hydropower Project, it has been revealed that the use of...

Himal Hydro-Middle modi
14/07/2013

Himal Hydro-Middle modi

मध्यमोदी जलविद्युत्् आयोजना लिमिटेडले विद्युत् उत्पादन अनुमति प्राप्त गरेपछि मध्यमोदी जलविद्युत् आयोजनाको निर्माणकार्य वर्षा सकिएलगत्तै सुरु हुने भएको छ ।   पर्वतमा निर्माण हुने १५.१ मेगावाट क्षमताको मध्यमोदी जलविद्युत् आयोजनालाई विद्युत् विकास विभागले उत्पादन अनुमतिपत्र दिइसकेको छ ।

Premier Wires Product:-
05/07/2013

Premier Wires Product:-

Address

New Road
Kathmandu

Opening Hours

Monday 10:00 - 18:00
Tuesday 10:00 - 18:00
Wednesday 10:00 - 18:00
Thursday 10:00 - 18:00
Friday 10:00 - 18:00
Sunday 10:00 - 18:00

Telephone

+977-01-4229922

Alerts

Be the first to know and let us send you an email when Premier Wires Pvt. Ltd. posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Premier Wires Pvt. Ltd.:

Share