13/08/2026
Margin erosion rarely starts on site. It starts at pricing.
A contractor prices on drawings that don't reflect the latest specification. A subcontractor excludes provisional sums that the main contractor assumed were included. A trade gets missed entirely because it spans two sections of a spec nobody cross-referenced. None of these are negligence — they're what happens when documents are reviewed sequentially rather than together.
EchoByld processes your full document set simultaneously, producing a structured BoQ where every line traces back to its source. The gaps show up before the price goes in, not after it comes out.
Join the pilot — https://www.echobyld.com/