02/08/2026
Prep work underway for a new site wide network upgrade. We’ve already installed 500m of OS2 fibre to each IDF point and data cabinets are in.
We will be utilising the 10Gbe throughput to increase network capacity for the next phase of the job, replacing 32 CCTV cameras.