26/05/2026
Reservoir Uncertainty and Development Strategy
Reservoir uncertainty is unavoidable in offshore concept screening. The real question is how much of that uncertainty space you can evaluate, and how quickly.
FLOCO® was built for exactly this. Engineers define a reservoir scenario and run it through an integrated techno-economic workflow, Wells, Subsea, Flow Assurance, Topside Facilities, Production Units, and Finance, with P10, P50, and P90 covered end to end. It's how concept-stage decisions get made when the goal is to move fast across a wide design space.
When a Petrel model is already part of the project, the FLOCO Petrel Integrator brings that simulation physics and production curves directly into the same workflow. The runs are organized as a structured VFP-based dataset, that covers the project's design space and then serves as the reservoir source that FLOCO draws from as facilities inputs vary downstream.
The screening environment becomes elastic: anchored to simulation physics, broad across the uncertainty envelope, and responsive to whatever concept the engineering team puts in front of it, without asking them to run a single additional case.
Subsurface and facilities, working from the same simulator-derived data. That is what integrated concept-phase decision making should look like.