Lone Star Technologies

Lone Star Technologies We provide IT Support services for your home and business, on-site and remote. Contact us today to see how we can serve you.

We have provided IT support services to the RGV for 10+ years in vast variety of industries.

🇺🇸 Happy 4th of July from all of us at Lone Star Technologies!.Wishing everyone a safe, joyful, and memorable Independen...
07/04/2026

🇺🇸 Happy 4th of July from all of us at Lone Star Technologies!.

Wishing everyone a safe, joyful, and memorable Independence Day filled with family, friends, and fireworks! 🎆

One of the vehicle exit kiosks at the airport was experiencing intermittent network connectivity issues, preventing reli...
06/15/2026

One of the vehicle exit kiosks at the airport was experiencing intermittent network connectivity issues, preventing reliable communication with the access control system.

After diagnosing the problem, we traced the issue to a damaged Ethernet cable. Our team replaced the faulty cabling with new Cat6 Ethernet cable, tested the connection, and verified proper network communication to the kiosk.

✅ Network connectivity restored
✅ Exit terminal operational
✅ Reliable communication re-established

Whether it's network troubleshooting, structured cabling, fiber optics, or managed IT services, Lone Star Technologies helps organizations throughout the Rio Grande Valley keep their critical systems running.

Time to troubleshoot some dash cam upload equipment.
03/18/2026

Time to troubleshoot some dash cam upload equipment.

IDF fiber distribution.After completing the MDF backbone, we’re now extending fiber throughout the facility to each IDF....
03/14/2026

IDF fiber distribution.

After completing the MDF backbone, we’re now extending fiber throughout the facility to each IDF. Precision fusion splicing, organized fiber management, and clean terminations ensure reliable connectivity across the entire building.

This is how large facilities stay connected.

Final step: fiber certification.After installation and fusion splicing, every fiber run was tested and certified using p...
03/09/2026

Final step: fiber certification.

After installation and fusion splicing, every fiber run was tested and certified using professional optical testing equipment to verify signal integrity and performance.

Clean installation. Verified performance. Infrastructure built to scale.

Next phase: network equipment deployment.

MDF fiber backbone installed.Fusion splicing, clean fiber management, and organized LC terminations now power the main d...
03/07/2026

MDF fiber backbone installed.

Fusion splicing, clean fiber management, and organized LC terminations now power the main distribution frame—the core of the network infrastructure.

Next up: extending fiber from the MDF to multiple IDFs across the facility.

This is how enterprise networks are built.

Installing the backbone of modern warehouses. High-performance fiber infrastructure built for speed, reliability, and sc...
03/04/2026

Installing the backbone of modern warehouses. High-performance fiber infrastructure built for speed, reliability, and scale.

Our team installs high-performance fiber infrastructure for warehouses and distribution centers—built for speed, reliability, and scale.

If your facility depends on connectivity, we build the backbone.

Fiber is not just an upgrade — it’s the backbone of enterprise-scale operations.Phase 3.1: Delivery and staging of high-...
02/26/2026

Fiber is not just an upgrade — it’s the backbone of enterprise-scale operations.

Phase 3.1: Delivery and staging of high-capacity fiber for a major distribution facility.

This installation will support:

• High-throughput wireless infrastructure
• Core warehouse systems
• Redundant network paths
• Long-term operational growth

Scaling facilities requires more than adding access points — it requires upgrading the foundation.

Phase 3.2 will cover full fiber installation and routing.

Can't have 100% smooth cable runs.
02/24/2026

Can't have 100% smooth cable runs.

Phase 1 complete.We installed elevated network cabinets 30 feet high across structural columns inside a fully operationa...
02/23/2026

Phase 1 complete.

We installed elevated network cabinets 30 feet high across structural columns inside a fully operational distribution facility.

Phase 2 is underway — structured Ethernet cabling to power warehouse operations, wireless expansion, inventory systems, and future automation.

Projects at this scale require:

✔ Lift coordination
✔ Safety-first ex*****on
✔ Clean routing and serviceability
✔ Zero operational disruption

If your facility is growing but your network infrastructure hasn’t evolved with it, it’s time to plan ahead.

Enterprise environments demand engineered backbones — not temporary fixes.

Address

508 Tangerine Drive Mission TX
Mission, TX
78573

Opening Hours

Monday 9am - 5pm
Tuesday 9am - 5pm
Wednesday 12:15am - 5pm
Thursday 9am - 5pm
Friday 9am - 5pm

Telephone

+19563404260

Alerts

Be the first to know and let us send you an email when Lone Star Technologies posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Lone Star Technologies:

Shortcuts

Share