30/08/2026
A customer hands you a facility as twelve monthly post-dated cheques. Twelve trips through a form
is how that gets entered wrong.
In MiadGo it is one dialog. First cheque number, how many, and how the dates step — monthly, a
fixed day of the month, one date on all of them, or every N days.
Three things it handles that a spreadsheet formula will not:
· The numbering advances on the numeric tail only, so A-100 becomes A-101, not A-1001.
· A total splits exactly, to the baisa — the remainder goes on the first cheque, not lost in
rounding.
· 31 January plus one month is 28 February, and the month after that goes back to the 31st. One
short month does not drag the whole run onto the 28th.
You see the full schedule before anything is saved, and you can edit or drop any row. It is all
saved together or not at all.
45 days free → miadgo.fikrfusion.com
#عمان