LARS Communications Ltd

LARS Communications Ltd LARS Communications can provide all your radio infrastructure requirements from planning and design We are also Achilles UVDB and RISQS registered. Specialties

The comprehensive service that LARS provides includes:
• Site survey
• Construction of greenfield, rooftop and street work radio sites
• Tower manufacture, assembly and er****on
• In house fabrication of bespoke steelwork
• Antenna rigging, alignment and testing
• Line of sight viability surveys
• Radio viability surveys
• Microwave radio installation and commissioning
• Site inspection a

nd maintenance
• Radio site decommissioning
• Project management

Working to BS EN ISO 9001 quality standards LARS is recognised for the high quality of its services and is also renowned for the innovative solutions provided. LARS Fabrication Service is CE Marking certified and LARS Site Engineering Services work in accordance with the FCS 1331 Code of Practice and have Safecontractor accreditation. We hope you find the information you need on this page and on our website, but if you do require any further details about a particular project or service, please call +44 (0)1524 727910.

  | The Snaefell tower is on the moveThe timber section of our new hybrid communications tower was collected from Berksh...
11/08/2026

| The Snaefell tower is on the move

The timber section of our new hybrid communications tower was collected from Berkshire-based McCurdy & Co. yesterday by R E Shuttleworths of Lancaster, who transported it on two low-loaders.

Today, it's being ferried across to the Isle of Man, before heading to Jurby Airfield, where it will await its next journey: being airlifted to the summit of Snaefell.

This specialist timberwork was fabricated by McCurdy & Co., whose impressive portfolio includes historic timber-frame reconstruction projects such as the reconstruction of Shakespeare's Globe Theatre.

It's another major milestone in the largest contract in LARS' history – the design, fabrication and installation of a new hybrid communications tower for NATS on Snaefell, 621m above sea level. More here:

https://www.lars.co.uk/2026/06/22/lars-secures-biggest-contract-in-company-history-for-hybrid-tower-on-the-isle-of-man/

  | Snaefell UpdateWe recently shared the news of the biggest contract win in LARS’ history – the delivery of a hybrid c...
21/07/2026

| Snaefell Update

We recently shared the news of the biggest contract win in LARS’ history – the delivery of a hybrid communications tower for NATS at the summit of Snaefell on the Isle of Man.

Well, work is underway.

These images show the trial build of sections 4, 5 and 6 of the actual tower prior to galvanising. This temporary assembly is a vital part of the process, allowing our fabrication team to check everything and make any adjustments before the sections are finished and prepared for installation.

For a project as complex and remote as Snaefell, this level of preparation is essential, particularly for a tower destined for one of the most challenging and remote locations in the British Isles.

Read more in our latest blog update 👇

https://www.lars.co.uk/2026/06/22/lars-secures-biggest-contract-in-company-history-for-hybrid-tower-on-the-isle-of-man/

Introducing our Timber Inspection and Condition Surveys for hybrid telecommunications towers.Hybrid towers use timber up...
10/07/2026

Introducing our Timber Inspection and Condition Surveys for hybrid telecommunications towers.

Hybrid towers use timber upper sections to minimise RF interference, but these structures require expert assessment to stay safe, compliant and fit for service.

That’s where our specialist climbing engineers come in.

Unlike conventional inspection companies limited by MEWPs and cherry pickers, our specialist climbing capability means we can inspect every timber element, even on sites with restricted access. This means operators get a complete picture of structural condition, not a partial one.

Our TRADA‑trained engineers carry out full‑height visual and invasive assessments to detect early signs of:

👉 Fungal decay

👉 Structural weakness

👉 Defects such as splits, fissures, distortion and slope‑of‑grain issues

All inspections follow BS 4978 (softwood) and BS EN 16737 (hardwood), with particular focus on plated connection points, the areas most prone to wet rot.

Every survey includes:

• Full‑height timber assessment

• Deep drilling density testing to detect early‑stage wet rot

• Photographic defect recording

• Prioritised fault grading with recommended actions

• Estimated repair costs

• Timber Condition Certificate confirming safe access status

By tailoring survey intervals to each site's microclimate, we help operators stay ahead of deterioration, avoid emergency repairs and extend the life of valuable tower assets.

For more information about our Timber Inspections and Condition Surveys - https://www.lars.co.uk/services/timber-inspection-and-condition-surveys

LARS Wins Biggest Contract in Company History.We're thrilled to announce that LARS has secured the largest contract awar...
23/06/2026

LARS Wins Biggest Contract in Company History.

We're thrilled to announce that LARS has secured the largest contract award in our history – the supply and installation of a new hybrid communications tower for NATS on the summit of Snaefell in the Isle of Man.

Standing 621 metres above sea level, Snaefell presents one of the most challenging installation environments in the British Isles. With limited access to the summit, sections of the tower will be transported by helicopter before being assembled on site – making this a truly unique project for our team.

The new tower will support critical aviation communications infrastructure and help NATS continue to deliver safe and reliable air traffic services around the Isle of Man.

Work is already underway, with the tower expected to be operational by summer 2027. We're excited to be part of this fantastic project and look forward to sharing updates as it progresses.

Read more here 👉 https://www.lars.co.uk/2026/06/22/lars-secures-biggest-contract-in-company-history-for-hybrid-tower-on-the-isle-of-man/

29/05/2026

Another - this time to 2020 and one of our most unique challenges – decommissioning a weather station on the remote, uninhabited island of Sule Skerry, 35 miles west of Orkney.

No skip. No disposal facilities. A designated Special Protection Area teeming with puffins, gannets and seals. A tiny window of opportunity between breeding seasons. And the only way in? By helicopter.

Working alongside PDG Aviation Services and with guidance from Scottish Natural Heritage, we successfully dismantled and removed the structures back to the mainland with minimal disruption to the island’s wildlife.

Projects like this are a reminder of what can be achieved with the right planning, teamwork and a genuine can-do attitude.

A huge thank you again to everyone involved in making this unique operation a success.

15/05/2026

to one of our most memorable decommissioning projects – the controlled demolition of a 135m guyed mast at the Mablethorpe Remote Radio Station in Lincolnshire.

From detailed ecological surveys and safety planning to precision explosive demolition and full site clearance, this project showcased the expertise, coordination and care our team brings to every complex structural decommissioning operation.

After standing since 1991, the mast was safely brought down with minimal environmental impact and zero disruption to the surrounding area.

Watch the demolition unfold in today’s flashback film.

Happy Earth Day 🌍At LARS, sustainability isn’t just a once-a-year conversation, it’s built into how we operate every day...
22/04/2026

Happy Earth Day 🌍

At LARS, sustainability isn’t just a once-a-year conversation, it’s built into how we operate every day. We’re proud to hold ISO 50001 accreditation, the international standard for energy management systems, which reflects our ongoing commitment to improving energy efficiency and reducing our environmental impact.

From monitoring energy use to implementing smarter, more sustainable practices across our operations, we’re continually working to do better. After all, it's not about the certificate on the wall, it's about the responsibility we feel to our clients, our communities and the planet we all share.

Earth Day is a reminder that meaningful change comes from consistent action. Our ISO 50001 accreditation reinforces our commitment to doing exactly that – operating responsibly, reducing our environmental footprint and supporting a more sustainable future for the industries we serve.

Address

Keer Bridge Depot, Scotland Road
Carnforth
LA59RQ

Opening Hours

Monday 8am - 5pm
Tuesday 8am - 5pm
Wednesday 8am - 5pm
Thursday 8am - 5pm
Friday 8am - 5pm

Telephone

01524 727910

Alerts

Be the first to know and let us send you an email when LARS Communications Ltd posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to LARS Communications Ltd:

Shortcuts

Share