10/11/2022
Our latest completed project was the installation of a 560Kva generator to back up an entire nursing home at Wahroonga in the case of a power failure. The project consisted of the design and installation of a new site main switchboard with automatic transfer switch to work alongside the purchased generator, liase with Ausgrid for the shutdown of the onsite sub-station and connection of new service mains. Through careful planning we were able to only require power outage to the nursing of only 4 hours with small local generators powering essential equipment.